Klamath County Community Development -

Parks Division

Tom Crist, Parks Supervisor

The Klamath County Parks are undergoing improvements.

Klamath County Parks has received a $1,044,181.00 Grant Award Co-agreements with Oregon Department of Fish and Wildlife and Oregon State Marine Board.

Improvements Made in 2003

Park Name Improvements Made
Eagle Ridge Park New CXT Vault toilet
Petric Park New CXT Vault toilet
Hagelstein Park Electrical updates
Henzel Park Plumbing updates

Improvements Made in 2004-05

Park Name

Improvements Made

Eagle Ridge Park

New ramps, rebuilt floats, & new picnic tables

Petric Park

New ramps, floats, paving, curbing, & striping

Hagelstein Park

New ADA restroom sidewalks

Henzel Park

New ramps, floats, paving, curbing, striping, & ADA restroom sidewalks

Wocus Bay

New ramps, floats, paving, curbing, striping, & new CXT Vault toilet

Improvements Made in 2005-06

Park Name

Improvements Made

Henzel Park

Pending: New CXT Vault toilet (Grant Awarded April 4, 2006)

Improvements Made in 2006-07

Park Name

Improvements Made

Henzel Park

Restroom project completed.
Staff designed & built new picnic tables with steel frame construction- Our cost $100.00 ea.
New portable sprinkler system.
Modify design and improve float construction, rebuild floats as needed.

Wocus Bay

Level restroom and add ADA sidewalk.

Improvements Made in 2007-08

Park Name

Improvements Made

Sportsman Park

Acquisition of Sportsman Park to provide sustained ownership and management. This was a $762,500.00 project.

Crystal Springs Update floats to meet ADA requirements, Gravel parking area and install new fencing.
Stevenson Park Gravel parking lot, Repair damage to restroom and fencing caused by vandalism.
Cy Bingham Install back flow control in water system, new fire rings and picnic tables.
Petric New signage.
Henzel Rebuild floats, Repair damage to restroom caused by vandalism

Eagle Ridge

Rebuild floats


New! Oregon State Marine Board (OSMB) donated a 19' Aluminum Jet Sled Boat w/ dual axle trailer (est. value $15,000.00), to perform regular maintenance on the floating restroom.